First things first: who manages, who supplies, who maintains
On 28 #October 2026, near #Urda, on the Madrid-#Seville high-speed line, an #AVE train ran into an #Iryo train that was standing on the #track. The death toll reported in the coverage is 69. Since then we have been fed rivers of acronyms: LZB, ERTMS, ETCS, ASFA, BSL. And when the story stops at the acronyms, without saying who does what, who built what, who signed which #contracts, every debate is smoke. So I will draw the map myself.
AVE is not a #company that runs tracks: it is the high-speed service of #Renfe, the public railway #operator. The tracks, the #signals, the control centres and the installations are managed by #Adif and Adif Alta #Velocidad, the #network manager: it is the party responsible for the safety of the #infrastructure and the contracting #authority for the integration of the systems running on it. Several operators run on those tracks, each responsible for its own trains and its own operations: Renfe with its AVE trains, and Iryo, the private competitor. The train that was hit was an Iryo; the train that hit it was an AVE. Two different companies, one infrastructure, one single manager of that infrastructure: Adif.
Then there are the companies that build and maintain the infrastructure, and this is where the public narrative turns to fog. The train protection system installed on the Madrid-Seville line is called #LZB, #Linienzugbeeinflussung. The technology was born in #Germany, developed essentially by #Siemens together with the central office of the #German federal railways in Munich; the next generation of onboard equipment also involved #SEL, a company that later ended up in other groups. The contract to renew the line’s #signalling was awarded in 2021 to #Thales #España #GRP, for 77.5 million euros before VAT, roughly 93.8 million with VAT, within an overall programme that Adif puts at more than €136 million, including VAT. The maintenance of the #corridor’s traffic control installations belongs by contract to a UTE, a temporary #consortium of companies, formed by GTS Transportation Spain and Sistemas y Montajes Industriales: the rail branch of GTS, born inside Thales, passed to the Hitachi group in 2024, while Sistem remains an autonomous partner. And mind this: the transfer of a business branch from one group to another does not by itself document who stepped into each individual contract. Siemens, finally, competed for the renewal contract and lost it.
Keep this #chain in mind: Siemens at the #origin of the #technology, Adif as manager and contracting authority, Thales España as renewal #contractor, a consortium with the #Hitachi group inside and a Spanish partner maintaining the old system, Renfe and Iryo providing the trains and the #passengers. When you hear a talk show say “LZB failure” without naming any of these actors, you are watching a trick: technology without responsible parties is a ghost, and nobody holds ghosts to account.
The acronyms, explained without anaesthesia
LZB is a #continuous train control system: ground installations, a cable laid along the track that talks to the train, onboard #equipment. It tells the #driver how fast the train may go and where it must stop, and it applies the brakes itself when needed. It is not a #radar that sees obstacles: it works with the #information it receives from the line and from the trains.
The #interlocking is the safety brain that governs points, routes and signals according to where the trains are. The LZB centre feeds on its data. #ERTMS is the #European system meant to replace these national installations; its core, #ETCS, at the level planned here talks to the train over GSM-R radio instead of a cable. And of course, more European impositions sold as progress: in the name of #harmonisation you dismantle what works, and the bill is paid in real #efficiency and real safety, through years of worksites, open interfaces and transitional configurations. I say this as a judgement on the process and its priorities, not as a technical #measurement of one system against another: ERTMS is a European standard with several #suppliers, and here the contractor is Thales; the problem is not the acronym, it is how the #transition the acronym imposes is governed. #ASFA is a simpler, intermittent #protection used as a safety net: it is not equivalent to LZB’s continuous #supervision. BSL is the operating regime based on lineside signalling when continuous control is not available.
Now the point on which the acronym-driven #narrative keeps slipping: none of these #acronyms lives alone. Behind every acronym there is a #manufacturer, an #integrator, a contract with #technical #annexes, a #maintainer, a body that validates. When the story stops at “the old LZB broke down”, without saying who maintains it, who is modifying it and who answers for the modifications, that is press office #journalism. The #question “who owns LZB?” must be split into five: who developed the technology, who holds the #software and the rights, who built the specific #installation at Urda, who manages the infrastructure, who maintains that precise configuration today. With the documents we have gathered, the answers only come in part: we know the historical origin of the technology, we know the infrastructure manager and we know the contractor maintaining the corridor. Who holds today the software and the rights of each individual installation, who manufactured and integrated the Urda installation itself, and how the work is split between the local maintainer and the parent companies, cannot be derived from the documents we have gathered. And that documentary hole, in a national debate over 69 deaths, is already a scandal in itself.
The migration: the old system changes while it must stay in operation
Because there is one fact that changes the whole #perspective, documented in black and white in the #tender #files: the Madrid-Seville is not an old line left to die. It is a line in the middle of a technology #migration. And here there are two distinct documents. The #specifications of the first tender, later abandoned by Adif, required the LZB #functionality to be guaranteed before, during and after the works, including after the entry into service of ERTMS, with the #decommissioning of the system explicitly excluded from the scope of the project. The announcement of the second award, the one won by Thales España, confirms that the LZB functionality must remain guaranteed with the new interlockings, connected to them through a serial interface. Translated: while you install the new, you must keep the old alive, and to keep it alive you have to touch its connections. You are not placing a new box next to an old one: you are performing open-heart surgery on a safety system while trains pass over it at 300 kilometres per hour.
And I am not the one saying that this #coexistence is delicate. In the first tender Siemens filed an #appeal supported by an #expert report pointing at the possible difficulty of maintaining the safety of the line with two different systems operating simultaneously. It is a party-submitted expert report, produced by a competitor in a legal fight over a tender, quoted in the #March 2021 #decision of the administrative #tribunal for contractual appeals: not a scientific #verdict, not a finding of #incompatibility. But it is on file, and it says that the coexistence problem was known, written down and argued before a tribunal years before the tragedy. Whoever tells the story of LZB failures today as the senile decline of an ageing technology should explain why they leave this episode out.
Another #distinction matters here: as of the date of the #accident, ERTMS was reported as installed and under #testing on the line, not yet in commercial #service, according to the public #reconstruction. Entry into service was expected for early 2027. Installed, tested, approved, authorised, in #operation: these are different states of an installation, and confusing them produces wrong conclusions in both directions. You cannot claim ERTMS was protecting the trains that day; you cannot claim either that the worksite was a separate world that did not touch the existing system, because interlockings, track circuits, #telecommunications, power supplies and interfaces are the very object of the contract. And I do not know, because none of the documents we have consulted says it, what the exact configuration of the Urda installations was that day and what had been touched there: knowing that is exactly one of the things that should be demanded.
And this is where I concentrate my #suspicion and my #thesis. The repeated LZB #failures on this corridor, documented for years and intensified in the drivers’ accounts, are presented as the whims of an old system. The German Siemens system did its job on this line for decades; the ordeal we are being told about today coexists with the years in which people started #tinkering with it to migrate it to the shiny European system that Thales is implementing here. My main #hypothesis, my strongest #conviction on this dossier, is that the suffering is born at the #boundary, in the interfaces being modified to make the old and the new coexist.
A #hypothetical #example of how a protection #system sickens during a transition: a data map updated on one side and not on the other, a response time that changes, and the system receiving information it can no longer validate goes restrictive or stops. I am not talking about false authorisations: at Urda none of the documents we have gathered allows me to claim that, and I do not claim it. I am talking about a system that stops working because its boundary has become a construction site.
And let me add the detail no talk show acronym will give you: two protection systems are not necessarily two #independent chains: if they share their #inputs, the interlocking or the train #detection, a single upstream problem can hit them both. I say this as an investigator, not as an expert witness holding the #logs: I do not have those logs, and without logs a hypothesis remains a hypothesis, declared as such. But it is my main suspicion, and it is the point that the narrative built out of acronyms systematically leaves in the shadows.
And one piece of #honesty is owed, because this thesis stands on dates, not on #nostalgia: the documents we have gathered record failures since 2024 and do not date the first local #intervention at Urda, so I will not say the system never failed before, nor that everything began with the summer tests; a temporal sequence, by itself, does not prove a cause. The #chronology must be cross-checked against the actual dates of the works, not with the press releases.
The real failure: functional architecture and the urbanisation of project phases
Anyone who has run a #programme of this size knows where you win and where #control is dangerously lost: not in the individual #device, but in the functional architecture and in the #urbanisation of the #phases. Big words? No, concrete things, and let me break them down. First: configurations and phases. Knowing, for every safety #function, who performs it at every instant of the transition: today the interlocking talks to the LZB centre through this interface, with this #version, with this data map; tomorrow night we change that module, so who guarantees the function while we change it? Second: boundaries and responsibilities. Every interface with a single named owner, every transitional configuration with its version map. Third: #progression requirements. You move to the next phase only when #regression tests, link loss and recovery tests and a formal #authorisation to return to commercial service say you can. Fourth: safe return. A #rollback plan that can actually be executed, not a wish. Fifth: degraded operation. When the protection falls, procedures, checks and other #barriers kick in according to the planned arrangement, and in that arrangement the operator and the driver are one link, not the only net: a link that must be sized, trained, protected from #fatigue, not invoked afterwards as a #scapegoat.
And here is the question I consider central, stated with the exact words of what is missing: I have not found, among the documents consulted, any document certifying that the serial interface linking the LZB to the new interlockings is compatible and approved to operate with them and with the transitional set-up at Urda. The specifications require the LZB functionality to remain guaranteed; a contract #requirement is not the approval of a specific installation. Changing the configuration of a safety system in #production without prior #validation of that configuration is like changing the #navigation software of an aircraft in mid-flight between #Madrid and New York, trusting the good faith and the skill of the control towers in case the software shuts down. If that approval exists, covering the exact configuration and the transitional phase at Urda, provide it to the bodies that must verify it and explain publicly which configuration and which transitional phase it covers: the #analogy defuses itself. Until it appears, the question stands.
And one thing must be said clearly, because final #approvals are often waved around like an #amulet: the #acceptance test of the final #configuration verifies that configuration; by itself it does not prove that all the intermediate configurations the system lived in, night after night, while passengers were riding over it, were safe. That is what cumulative risk means: ten individually harmless modifications can compose a system nobody has ever validated as a whole. And the responsibilities here have precise role names: #management must secure means, time and #integration; #engineers design and modify; independent #assessors assess. When the result is a black box, the failure belongs to whoever was supposed to keep it transparent.
Let us also distinguish, because it is decisive: one thing is the origin of the failure that took LZB out of play that morning, another thing is the set of barriers that were supposed to prevent a failure from becoming a #collision. The public #sequence attributed to the ministry speaks of loss of protection around 8:30, authorisation to resume normal running at 8:36, impact at 8:53. The loss of protection had initially stopped the trains. Then something, in the chain of procedures, communications and decisions, put a running train behind a standing one again. A well-designed system tolerates the failure; it is the collapse of the subsequent barriers that turns a failure into a tragedy. The #design, the resources and the #verification of those barriers cannot be offloaded onto the employee on shift: they are the responsibility of whoever runs the system.
That is why the #fable of #human #error pisses me off. Not because the error does not exist: it may very well have happened. But putting all the #blame, at the end, on an employee, a #traffic #regulator on duty, a driver, is unacceptable when the entire management of the transition remains a black box. Human error is the last link; who built the chain? Who decided how much #pressure, how much fatigue, how much procedural #ambiguity that last link was supposed to bear? I am not saying the investigators are ignoring all this: I do not know and I will not invent it. I am saying that the public narrative, the one made of press releases and talk shows, is silent about it, and silence about what matters is an editorial choice, not an accident.
The #answer I demand as an #investigator is therefore a different one: whoever governs a migration of this #scale must be able to document, day by day, how they kept safe the system that carried passengers until the very last day of the old regime. #Architecture, interfaces, versions, tests, authorisations, barriers. If that #documentation exists, show it. If it does not, then the real failure is not in the Urda control centre: it is in the head of whoever conducted the #orchestra. That obligation does not disappear when the minister resigns, either.
The resignation of the fuse that refused to keep burning
On 3 #November Óscar Puente resigned as Minister of Transport.
The convenient #theory is circulating: someone from above ordered him to resign. I do not buy it, and here is why. A #Minister of #Transport on the front line of a dossier like this is the perfect #fuse for a #government in trouble: you leave him exposed, you let him face the cameras at every press #conference, and when the pressure becomes unbearable he burns and the installation stays up. A fuse that useful you do not dismiss: you keep it. My reading, and I declare it as a personal reading because no document lets me into #Puente’s head or into the government’s back rooms, is that the man understood the game and pulled himself out: he stopped burning for a system that had left him alone, head on, against the dossier. And inside that same reading I place the suspicion that comes with it: that around that dossier too many people know their own shortcomings and have every interest in staying quiet. I do not have inside information about that decision; it is my judgement on how systems of power behave when a presentable culprit is needed.
This #reading absolves nobody, starting with him: Puente remains the minister who publicly defended the management, reeled off hundreds of millions in #investment as if they were a safety certificate and endorsed a narrative centred on the failures of the old system rather than on the #governance of the transition, and an aggregate spending #figure proves the safety of no transitional configuration. His resignation is a political act, perhaps even a dignified one; it is not an answer, and it absolves neither the government that left him exposed nor the industrial players who in this story have contracts, obligations and names. The fuse has pulled itself out of the panel: now the electrical panel stands there, in plain sight, and that is where we must look.
And now the electrical panel has a name: Pedro Sánchez, facing 29 November
Because there is a calendar that turns this whole story into something bigger than a ministerial crisis: #Spain’s general #election takes place on 29 November 2026, with the official campaign starting on the 13th. #Óscar Puente’s resignation does not land in a quiet period in the middle of a parliamentary term: it lands a few weeks before the vote, with #Pedro #Sánchez, the Spanish prime minister, handling 69 deaths, a cabinet crisis and a pre-campaign all at once. Anyone who wants to understand what this resignation really means must read it there, in that calendar, not in the press releases about dignity.
Let us start with what the government gained by keeping Puente where he was. A Minister of Transport on the front line concentrates the pressure: he gives the Urda #dossier a face that is not the prime minister’s, #confines the #political cost to one #ministry, and buys time, which with 29 November approaching is the most expensive commodity on the market. It is the classic function of the fuse I described above: protecting the installation. And the installation, a few weeks from the polls, is Sánchez’s campaign.
That fuse is gone. And here is what interests me: watch the #speed with which the machine has tried to convert the loss into electoral merchandise. Sánchez publicly backed his minister while the man held the front line; now, in public, he praises the #resignation as an act of political #dignity, of empathy with the victims, as proof that not all politicians are the same, and announces that #Carlos Cuerpo, the economic vice-president, will take over Transport as well, presented as a guarantee of management #capacity, #integrity and the right #temperament. Let us call the operation by its name: the same prime minister who stood behind the minister while he resisted is now selling his exit as a certificate of moral #superiority. The guilt has not changed address in a week; what has changed is the usefulness of the story. This is my reading of the public statements, not a chronicle from the back rooms.
Now count with me the cards Sánchez has been playing on this dossier, because they have burnt out one after another. The first was management: proving with facts that the #railway system was governed; 69 #deaths on the Madrid-Seville line, nine months after another #tragedy, have left that card in ashes. The second was control of the narrative: the acronyms, the human error, the hundreds of #millions invested; that fable dismantles itself a little more every day the black box of the transition stays shut. The third was keeping Puente in place as a lightning rod; he is gone. The fourth, the one being played now, is reselling the fuse’s exit as an exemplary #gesture and putting a technical profile up front that makes no noise. When what a government lays on the table over 69 deaths is the aesthetic management of a resignation, the problem is not communication: it is that it has no substantive answer to communicate.
And I will say something simple and ferocious: Sánchez has lost, along with the minister, his #candidate in #Valladolid and one of his most trusted men, and he now stands, personally, as the final #addressee of the questions Puente is no longer there to absorb. The questions are the same ones, the ones in this #article: who governed the transition, where are the approvals of the transitional configurations, who designed the barriers that failed. Sánchez can praise the dignity of the exit all he likes: what his government still owes the dead of Urda is not a gesture, it is the documentation. And that debt, since 3 November, carries his name. But shifting the political pressure is not the same as controlling the technical risk.
The handover of portfolios seen from my own field: what the nameplate does not change
There is a very concrete #object changing hands in Madrid these days: the Transport #portfolio. And there is another, far less photogenic, that no #handover moves by itself: the technical risk of the Madrid-Seville migration. A change of minister documents no #correction in the installations; whether any configuration changed with the handover, we do not know, and that is why the risk #register of the works must follow the file, not the nameplate on the office door. My field is #cybersecurity and risk governance, and from that vantage point a changeover is examined with a method that needs no hackers and no conspiracies: #traceability of decisions, integrity of the #evidence, a map of dependencies, owners with names, #continuity of operations. The first rule is brutally simple: the nameplate changes in an afternoon; the system does not know who the minister is. Anyone selling you the resignation as a safety measure is selling you a nameplate.
That is why the #layers must be kept apart, because the #noise of these days is blending them into a single mush. Political control sets #priorities and #resources and answers to #Parliament and the ballot box. The infrastructure manager answers for the safety of the network and for its contracts. The operators, for their trains and their staff. The suppliers and maintainers, for what they have designed, installed and modified. The safety authority assesses and authorises. The courts, if it comes to that, establish individual #responsibility. Six layers: Óscar Puente’s resignation directly changes only one, the political top, while the obligations of everyone else remain fully in place. No political changeover extinguishes a #maintenance obligation or lowers a safety requirement. Whoever blurs these levels of responsibility is manufacturing the next black box.
Better or worse? The conditions, not the horoscope
Does the minister’s exit make the transport system better or worse? By itself, neither: a #changeover is a #window, and windows let in fresh air or rain depending on how they are managed.
It can get better if #verifiable conditions are met, and I say this as professional #judgement, not as a promise: the new political #leadership demands to see the risk register of the migration, not the slide deck of milestones; every interface and every transitional configuration has a clearly identified owner, with responsibility formally assigned.
Realistic resources and #timelines must exist to validate what sits half-finished, with independent verification rather than self-certification by the #party executing the works; the changeover must be documented, with a written handover of open files, pending decisions and warnings received.
And the technical #records and the documentation of the transition must be preserved in full, at the #disposal of the investigators and the competent authority. This is a proposal of method, not an insinuation that anyone is destroying evidence: I have no evidence to support that claim and I am not making it. Nor am I asking for network topologies and configuration details to be published: full technical access for the bodies that must verify, conclusions and responsibilities for the public.
It gets worse if nobody governs the changeover: a decision #vacuum in which nobody signs anything, loss of #memory because the people who knew the files change #offices, essential maintenance and decisions frozen out of fear, or the opposite and worse: an entry into service accelerated so that #victory can be announced before the polls. And let me be precise: more #delays and precautionary restrictions can worsen the service and, at the same time, be justified safety decisions, if they are proportionate to the risk while verification runs; keeping the timetable intact so that nothing shows is propaganda with passengers on board. And do not expect from me the inverse promise either, the absolute test that guarantees everything: it does not exist in any complex system, and anyone making that promise is promising what cannot be guaranteed.
The #electoral #calendar complicates all of this for one precise #reason: the timelines of technical validation must be set by the tests and the corrections, not by the date of the vote. I am not forecasting percentages or seats: I am saying that a government arriving at 29 November with the Urda file open has a structural incentive to declare #normality before having verified it, and that incentive must be watched like a conflict of interest. The #voters’ judgement of the government’s capacity to manage will be formed there: not on whether there was a resignation, but on whether anyone proved able to govern the window the resignation opened.
And on Puente: the political account is judged at the polls, the criminal one is proven in court
There remains the question everyone asks under their breath: #legal #consequences for Óscar Puente? We must be surgical: three currencies are being mixed up. Political responsibility: with his resignation Puente has taken on a political cost, he has not settled any account; that judgement remains open and will be delivered at the ballot box.
Criminal responsibility is personal and must be proven; it is not inherited from an #organisation chart.
And #compensation follows another path: the injured parties may claim damages directly from the public #administration when the legal requirements are met, without that closing the routes of #insurers, operators and civil or contractual #liability; and the administration, once it has compensated the victims, pursues its own officials and staff for the liability they incurred through intent or through gross fault or gross #negligence, after a formal procedure. Distinct paths, distinct standards of proof, even though they feed on the same facts.
On the criminal path, the #framework is conditional and should be stated without tricks. Under #Spanish law an outcome such as the Urda collision can be attributed to someone on the basis of a failure to act only when the person who failed to prevent it had a specific legal duty to act and that #omission is equivalent to causing the result; and the offences of causing death or injury through negligence require the degree of negligence each offence provides for and its link to the harm.
Translated: one would have to prove concrete acts or omissions of the former minister, a specific duty and a real #possibility to act, what information he received, what he decided or failed to decide, and the link to the outcome. The office is not enough: nobody is guilty for sitting high in the organisation chart; travelling up the chain, as I demand throughout this article, means reconstructing documented decisions, not distributing guilt by rank. I am not describing a charge already established against Puente: I am setting out what would have to be proven to establish responsibility, in one direction or the other.
The resignation proves neither guilt nor #innocence, nor does it extinguish possible responsibilities: it is neither the #confession the opposition would like, nor the acquittal the government would like to sell.
The questions of any #prosecutor are my questions as an #analyst: which #warnings reached the ministry, what was decided about the governance of the transition, with what resources and what verifications. The passengers at Urda were not travelling on an organisation chart: they were travelling on a system made of dated decisions, warnings received and documentable risks, and a resignation has no power to file any of that away. That is the difference between a gesture and an answer.
Raffaele Di Marzio
All my “insane” books on cybersecurity and governance are here 👇 https://cyberium.limited/bookshelf.html
Photo: © Miguel Bustos. Source: Railin (https://www.railin.net/en/analysis/the-inexplicable-at-urda/).
